Projects

Item

Customer Name

Work Summary

Time of Execution

1

AO Budyanskiy Fayans

Revamping of shop power supply

1999

2

Kurchatov Department of Elektrocentromontazh (Russia)

Oskolsky Electrometallurgical Works, mill 350

2000-2001

3

GPU Poltavagazdobycha

Substation 110/10 kV ("Solokha")

2000-2003

4

Zmiivska Thermal Power Plant

Electrofilters (electrics)

2001-2002

5

OOO Prikolotnyanskiy Oil Extraction Plant

Revamping of shop power supply

2001-2009

6

AK Kharkovoblenergo

Substation 110/10 kV ("Kovsharovka")

2001-2004

7

OAO Pervukhinskiy Sugar Production Plant

Revamping of intrashop power supply

2002-2008

8

Kurchatov Department of Elektrocentromontazh (Russia)

Kurskaya Nuclear Power Station, revamping of power units

2002-2009

9

OOO MKDU

Power supply (6 kV and 0.4 kV) of residential houses and offices in Kharkov

2003-2008

10

Novomoskovsk Department of Elektrocentromontazh (Russia)

Ryazanskaya Thermal Power Station, Kashirskaya Thermal Power Station, revamping of power units

2003-2004

11

Solar Power Station of State Enterprise NPC UKRENERGO

Substation 110/10 kV ("Yugo-Zapadnaya")

2004

12

OOO Henkel-Bautechnik

Power supply (6 kV and 0.4 kV) of the construction mix production plant in the city of Balakliia

2004

13

AK Kharkovoblenergo

Revamping of cable lines and transformer substations in Kharkov

2005-2006

14

Cherepovets Iron and Steel Works (Russia)

Cable power lines (10 kV and 220 kV), packaged switchgear of coke-oven plants

2005

15

Novomoskovsk Department of Elektrocentromontazh (Russia)

Konakovskaya Thermal Power Station, revamping of power units

2005-2006

16

AK Kharkovoblenergo

Substation 110/10 kV ("Sokolniki"), substation 110/10 kV ("Pobeda")

2006-2007

17

AO Kharkov Bearing Plant

Substation 110/10 kV ("Kharverst")

2006-2007

18

Department of Cultural Heritage Sites Protection of Odessa Regional State Administration

Odessa National Academic Theatre of Opera and Ballet

2006-2007

19

Odessaoblenergo

Substation 330/110/6 kV ("Artsiz")

2006

20

OAO Sevastopolenergo Power Company

Substation 110/10 kV (No.15)

2007

21

Novomoskovsk Department of Elektrocentromontazh (Russia)

Substation 110/10 kV ("Panfilovskaya"), substation 110/10 kV ("Grach"), substation 110/10 kV ("Marfino")

2007-2008

22

Moscow Department of Elektrocentromontazh (Russia)

Vnukovo gas-turbine unit

2007

23

Kurchatov Department of Elektrocentromontazh (Russia)

Lebedinskiy Mining and Processing Works, substation 110/35/10 kV

2008

24

Novomoskovsk Department of Elektrocentromontazh (Russia)

Kashirskaya Thermal Power Station, revamping

2008-2010

25

OOO Karpatneftekhim

Electromembrane process unit with capacity of 200 thous. tons of caustic soda per year

2008-2009

26

OOO Dankoisol

Industrial complex of mineral goods production, city of Dokuchayevsk

2008

27

GK Ukrgazdobycha

Commissioning of high-voltage equipment and relay protection and automation modules at PS GPU Poltavagazdobycha

2008-2009

28

AK Kharkovoblenergo

Substation 110/10 kV ("Stalingradskaya"), substation 110/10 kV ("Pervomaiskaya"), substation 110/10 kV ("Svet Shakhtera")

2008-2009

29

OOO Koksokhimelektromontazh (Russia)

Thermal power plant No.21(Moscow), terminal of Nakhodka port, commercial seaport, distribution transformer substation No.1, distribution transformer substation No.2. (city of Ust-Luga)

2007-2009

30

RPD Cherkassytransgas

Sofievskaya Compressor Plant - electrical installation and commissioning

2010

31

RPD Cherkassytransgas

Ilyintsy Compressor Plant - electrical installation and commissioning of the cushion start system for STD 12500 electric motors

2010

32

AK Kharkovoblenergo

Substation 110/10 kV ("Gorodskaya") with overhead feed lines (110 kV) - electrical installation

2010

33

ZAO APO Tsukrovik Poltavschiny

Globinskiy Sugar Production Plant - electrical installation and commissioning

2010

34

OOO Prikolotnyanskiy Oil Extraction Plant

Prikolotnyanskiy Oil Extraction Plant - electrical installation and commissioning

2010

35

DK Ukrgazdobycha, National Joint Stock Company Naftogaz of Ukraine

GPU Poltavagazdobycha - commissioning works

2010

 

Last news

  • November 29, 2913

    Elektrouzhmontazh, LTD finishes revamping of CDU - 6 kV at power unit No.1 of the South-Ukrainian NPP

  • August 27, 2013

    Elektrouzhmontazh, LTD effected a contract with Consortium RPA Ukrgidroenergobud for construction completion of hydroelectric units No.2 and No.3 at Dnestrovaya PSPP.

  • June 4, 2013

    A contract with NNEGC Energoatom State Enterprise for construction and assembly operations on revamping CDU - 6 kV at power unit No.1 of the South-Ukrainian NPP is concluded

  • July 31, 2012

    Works on revamping of Pavlovskaya power substation (110/6 kV) including replacement of transformers 1T and 2T 110/6 kV with 110/10/6 kV for 25 MVA are finished in June

  • June 30, 2012

    In June, a contract for replacement of 0.4 kV complete wireway of Parkhomovskiy sugar production plant is concluded; corresponding works are finished